HOT at 40:
How it All Started
Founded as a spin-off from Montanuniversität Leoben, our mission was to scale up an innovative thermal EOR method (Mobility-Controlled Steam Drive “MCSD” by the Application of Additives Soluble in Hot Water) from lab scale to a field pilot. It sounded like a great plan; ambitious, bold, and with plenty at stake.
Backed by Austria’s then-largest chemical company, Chemie Linz AG, the Aberfeldy heavy oil field near Lloydminster, Saskatchewan, Canada became our target for the pilot test.
How the Project Unfolded
Preparations progressed well until reality struck.
The oil price collapsed, from about 30$/bbl to below 10$/bbl, the US dollar weakened, and suddenly the economics no longer worked. Sounds familiar? Indeed. Not surprisingly, the Canadian operator cancelled the project.
And there we were: a group of young post-docs, full of dreams and ambitious plans, suddenly grounded. What had looked like a promising start turned into uncertainty overnight, and we found ourselves with little to do and a lot to rethink.
But we were lucky.
A Fortunate Turn of Events
It was Voest-Alpine that needed subsurface support for their oilfield services division. And this became our entry into Libya. Soon, we were engaged by the Arabian Gulf Oil Company (AGOCO) on smaller oilfield development planning projects, where we proved ourselves ready for more.
What followed were bigger assignments: a 12-month applied training program with a selected group of young geologists and engineers to develop field development plans (FDPs) for four AGOCO oil fields, and an integrated field development study on the giant Sarir C-Main field. This work started with a massive digitisation campaign and the creation of a digital database; a significant undertaking at the time, and the foundation for everything that followed.
40 Years of HOT: Key Milestones

We look forward to our next chapter together!