Cementing Technologies - DRI30
| 21-25 June 2027 | 5 days | Vienna, Austria | Course Fee: 4150 EUR +VAT Computer fee: 250 EUR +VAT | Register now |
Description
Cementing is a fundamental element of well construction and plays a critical role throughout the well life cycle. Mud removal and centralisation are also key processes to ensure a successful cement job. In complex and extreme well environments, special-purpose cements are necessary to address unique challenges. Well integrity is compromised unless efficient cementing operations are carried out in every casing. Cementing forms the basis for efficient well performance. The course will also cover liner cementing, staged cementing, and secondary cementing operations.
Course Level: Skill
Designed for you, if you are…
- A cementing operator or supervisor
- A petroleum or production engineer
- Drilling or completion engineer
- Oil field technical staff
How we build your confidence
- Course will be presented using properly designed slides
- Animations and videos on relevant issues
- Real-life examples of cement logs will be presented for interpretation and evaluation
- Daily recap sessions

The benefits from attending
By the end of the course you will feel confident in your understanding of:
- Special cement types and applications
- Calculating volumes of cement, mix water and additives
- Critical parameters (pump rates and pressures) for any cementing operation
- Calculating displacement rates for effective mud removal
- Selecting the proper additives based on well conditions
- Selecting casing hardware for successful cementing operations
- Interpretation of cement bond logs
Topics
- Overview of the different types of cementing jobs
- Cement lab testing and composition recommendations
- Cement calculations
- Cement placement - job execution and procedures
- Cement additives and mud removal
- Spacers and flushers
- Evaluating the quality of the cementing job
- HSE and cementing
